Photo of 44,000# bolster plate for stamping press being cleaned and prepared for shipment
Final touches and detailing work being done on a complete turn-key fabrication, machining, and assembly of a 30,000 # cassette washer finished in-house for a large automobile manufacturer
Design inspired by traditional Asian boat building techniques.
2 sets of large bronze Acme nuts and shafts, ready to ship to steel mill. Acme thread is ½ thread per inch.
Fabricated 12’ x 8’ plate table finish machined with tee slots in our Asquith Gantry Mill
Turning and boring operations of a 60” drum in our Stanko Vertical Boring Mill
Heavy rough turning of 12’ diameter kiln bearing ring in our 18’ Betts Vertical Boring Mill
Large mining truck axle ready for shipping, machined complete
Rough and finish turning on a large mining axle hub
35,000 # fly wheel for stamping press getting final bore done after machining complete from raw casing in our Stanko Vertical Boring Mill
316 Stainless steel heat exchanger getting sealing surface spiral grooved in our 5” Union Horizontal Bar. This process utilizes an integrated facing head attachment which is cutting an approximately 65” in diameter
Tandem crank shaft getting throws machined in our 50” swing American Lathe
84” fabrication getting finish bore cuts in our 5” Union Horizontal Bar
132” diameter plate being drilled in our 5” Union Horizontal CNC Bar
120” diameter weldment being turned in our 18’ Betts Vertical Boring Mill
High feed milling operation on 304 stainless steel. Being performed on our Asquith Gantry Mill
304 stainless steel plate being milled in our BMC 50 Hurco CNC Mill
Close up view milling weldment in Kuraki Bar
Fabrication being machined in our 4 3/8” Kuraki CNC Horizontal Bar
Close up view of bolster platen being milled using 12” face mill
Heavy milling operation performed on our 7” G & L Bar on a 25,000# stamping press bolster plate